Mfangano street, Terry House (Rainbow Hotel building)3rd floor ROOM 138
Closed
• Mon - Sat, 08:00-18:00
Apart from the burner,youll be required to alaonhave the following:
A high pressure regulator
A 5 m gas pipe
Thermometer
Pipe clips
Safe gas lighter
If you want a package which includes all ofvthe above ,the oruce is 15,000