We are located Munyu road and Ronald ngara junction mazzart Bet house 1st floor F25 ask liz
Closed now
• Mon - Sat, 09:00-18:00
How it Works:
Load: You insert the rivet mandrel into the nosepiece at the bottom.
Position: Place the rivet into the pre-drilled hole of the materials you’re joining.
Push: You push the handles toward the workpiece. The lattice expands and then contracts, pulling the mandrel through the rivet until it snaps, creating a permanent, tight bond.
Located at Mozart Bet Building First Floor Shop F25