New home bussiness center ruiru, next to kcb bank, 2nd flr rm 211
We R along thika road, ruiru town next to kcb bank or opposite equity bank ruiru and petanns driving
Closed
• Mon - Sun, 08:00-19:30
A Prism Assembly involves connecting all the parts needed to accurately reflect signals during surveying work. It’s a simple process but key to getting precise measurements on-site.
What You’ll Assemble:
Prism Pole – Adjustable for the right height
Prism Bracket/Holder – Holds the prism firmly in place
Prism – Reflects the signal to the total station
Target Plate (if included) – Improves visibility and accuracy
Quick Assembly Steps:
Extend and lock the prism pole to the desired height
Attach the prism holder securely to the pole
Place the prism onto the holder and tighten
Fix the target plate if required
Double-check everything is stable and aligned
Now your prism is ready for accurate, reliable fieldwork.