– Press tightly to extrude bubbles, and ensure that there is no bubble and keep it free from water for 24 hours. Do not tear the tape after construction;
– Not applicable to: Inferior wall, wall with oil, peeled wall, wrinkled tubes, cement floor, hot water pipe;
-It is not allowed to carry out construction with water, and the surface should be kept dry;
-The sand and ash on the base surface should be cleaned up before construction;
– It is not allowed to construct from the dorsal water surface, but from the upstream surface;
– It is recommended to use 4 inch wide tape for cement s. Because the cement surface is made of water seepage material, the range of 4 inch around the seepage point should be covered;
-Due to the different temperature in each area, in order to achieve the ideal waterproof effect, please choose the time whe ...