Laikipia Solar Water Pumping Project for irrigation.
Pumping begins at 7:30am in the morning and ends at 6pm evening thanks to 555 jinko mono solar panels. PV modules jinko solar's high-efficiency n-type monocrystalline silicon solar cell sets new record with maximum conversion efficiency of 26.89% is coupled to AC/DC pump (4.0kw/5HP, 272metres discharge 8,000L/h, outlet 11/4”)
Client) spent a staggering kes 750,000 for setting up solar system.
Projection:
The system fills 8 tanks of 10,000L each in 9-10hrs under low light intensity of the Sun (assuming worst case scenario).
Return on Investment is well under 2 years.
Location: Laikipia County.
Lead Time: 3 days(for solarization)
Project Costs: kes 750,000.(Solarization only)
System Life 12-13years.