1. Lay out & excavating to achieve desired depth within site
2. Hardcore back filling, blinding & casting the concrete slab / Masonry works
3. The mould casting this would be done from few selected rock occurring naturally. The mould size should be approximately 1100 meters to allow proper fixing during the rock formation process
4. The waterproofing process:this must be done on all water surface including cascading channel &basins there fore requires special attention
5. Setting the skeleton shaping &designing the fall cascade with the use of BRC mesh wire as internal reinforcement apply
6. Simulation process the rock fabrication involve fibreglass cement sand & waterproof
7. Plumbing work & fitting to be carried out immediately after successful leakage testing
9. Final touches flow testing & painting pump installation plant flowers.