tre.gif
Uza haraka
Janjaruka kwa Ununuzi
  1. Matangazo yote
  2. Ukarabati na Ujenzi
  3. Zana za Kupima na Upimaji
Imefadhiliwa
Nairobi, Nairobi Kati, 48 min ago
1 maoni

Prism Assembly With Optical Plummet

+1
Chapa Mpya
Hali
Nyingine
Aina
Anwani ya duka
Kiambu • Ruiru
New home bussiness center ruiru, next to kcb bank, 2nd flr rm 211
We R along thika road, ruiru town next to kcb bank or opposite equity bank ruiru and petanns driving
Closed
• Jumatatu - Jumapili, 08:00-19:30
A Prism Assembly involves connecting all the parts needed to accurately reflect signals during surveying work. It’s a simple process but key to getting precise measurements on-site. What You’ll Assemble: Prism Pole – Adjustable for the right height Prism Bracket/Holder – Holds the prism firmly in place Prism – Reflects the signal to the total station Target Plate (if included) – Improves visibility and accuracy Quick Assembly Steps: Extend and lock the prism pole to the desired height Attach the prism holder securely to the pole Place the prism onto the holder and tighten Fix the target plate if required Double-check everything is stable and aligned Now your prism is ready for accurate, reliable fieldwork.
Ripoti Unyanyasaji
Vidokezo vya Usalama
  • Usilipe mapema hata kama ni ada ya kusafirishiwa bidhaa
  • Kutana na muuzaji mahali salama pa umma
  • Kagua kipengee na uhakikishe ni nini hasa unachotaka
  • Hakikisha kwamba bidhaa uliyofungiwa ni ile ambayo uliagiza
  • Lipa tu ikiwa umeridhika
frame_left.gif