Clykay successfully completed the equipping of a 250-metre-deep borehole in Westlands, Nairobi, delivering efficient water supply solution. The project involved the installation of a 4 kW submersible pump and motor with a discharge capacity of 3 m3 per hour, carefully selected to meet the borehole's depth and water demand requirements.
The scope of works included pump and motor installation, rising main installation, electrical connections, control and protection systems setup, comprehensive testing and commissioning to ensure optimal performance. The system provides a consistent and dependable water supply for long-term use.